Gan Tie West Railway Station South Plot Project – Aluminum Alloy Doors and Windows Engineering Subcontract
Clients
China State Construction Engineering Corporation (CSCEC)
Region
China
City
Nanchang
Budget
$5.4 Million USD
Year Completed
October 2020
Size
Large-scale infrastructure project with substantial aluminum door and window installation across multiple structures
Sector
Construction & Infrastructure
Sub-Sector
Transportation and Public Infrastructure

About Project
The Gan Tie West Railway Station South Plot Project was a large-scale infrastructure project that included the installation of aluminum alloy doors and windows for a major railway station development. This project was carried out as part of the South Plot section and involved installing high-performance windows and doors to meet strict specifications for both durability and aesthetics.
Our Client’s Challenge
- High-Volume Demand – The scale of the project required timely delivery and installation of a large number of windows and doors.
- Environmental Resistance – The materials had to withstand harsh environmental conditions given the nature of the transportation sector.
- Structural Integration – The doors and windows had to align perfectly with the station’s architectural design, ensuring both functional and aesthetic harmony.
Our Approach And Solution
✅ Robust Materials – Used premium aluminum alloys designed for high strength and resistance to weathering, ensuring longevity and performance.
✅ Customization and Precision – Ensured custom solutions for door and window dimensions to fit the specific needs of the station’s architecture.
✅ Fast and Efficient Execution – Managed a seamless and coordinated installation schedule to meet the demanding deadlines of the overall construction timeline.
What Customers Say?
“ We were very impressed with the quality of the aluminum windows and doors provided. The project was completed on time, and the materials have performed excellently in terms of durability and functionality. ”